calendar>>April 12. 2011 Juch 100
Drain Closed Up at Huichon Power Station No. 2
Pyongyang, April 12 (KCNA) -- A project for building dam for Huinchon Power Station No. 2 was finished in the DPRK, successfully closing up its drain on April 9. This vast project was carried out in a little more than two years since its ground breaking.

As a result, the River Chongchon stopped its flow, making it possible to store enough water needed for electricity production.

This also opened a bright prospect for accelerating the operation of the station.

Copyright (C) KOREA NEWS SERVICE(KNS) All Rights Reserved.