calendar>>March 7. 2011 Juch 100
New Dam Building Method Developed
Pyongyang, March 7 (KCNA) -- The construction of the Huichon Power Station in the northern part of the DPRK is progressing apace by dint of new construction methods.

One of them is a method of prefab dam building.

Non-reinforced prefabricated concrete parts of different shapes have been made for the dam project.

This method makes it possible to build the dam at a high speed and in a simple way and ensure continuous concrete tamping, with less materials and manpower.

Copyright (C) KOREA NEWS SERVICE(KNS) All Rights Reserved.